East Wing Annexe, SGH
Detailed Design of the interior East Wing Annexe at Southampton General Hospital is well progressed; meanwhile BAM have commenced operations on site and the piling rig arrived in December. The new year will see the reinforced concrete frame rising to level D followed by the curtain walling and link-bridge which will pass over the Ambulance Deck and connect this new building to the East Wing of the hospital.




